Our Projects
S5 Environmental were engaged by a client to manage the ecological deliverables for a Reconfiguration of a Lot development application in Mansfield. Specifically;
This site was bisected by a waterway line and our team worked closely with the Brisbane City Council as well as revegetation contractors to ensure this waterway line was rehabilitated from an extremely degraded state to a valuable ecological corridor. Invasive weed and canopy species were removed and replaced with locally occurring native ground, shrub and canopy level strata. The banks of the waterway were stabilised with jute matting and coir logs during this process to allow the vegetation time to appropriately establish. S5 Environmental managed liaison with Brisbane City Council on behalf of our client, facilitating the ecology pre-start meeting prior to operational works as well as on and off maintenance rehabilitation inspections. The rehabilitated waterway is currently ‘on-maintenance’ for a period of 24 months. After this time, it will be dedicated to council who will maintain this rehabilitated waterway corridor in perpetuity.