Our Projects
S5 Environmental was engaged by a client investigating a potential Development Application (DA) for Stage 2 of a lifestyle lot residential development to be sited on their 78 ha property located on the outskirts Stanthorpe, within the Southern Downs Regional Council (SDRC) local government area. Stage 1 of the development has been approved for development, with minimal constraining mapped overlays. The area proposed for Stage 2 of the development was subject to State and Local Government mapping.
Our team undertook a Preliminary Assessment and Advice report and site inspection, which highlighted constraints of State and Locally mapped vegetation, which by highlighting historically modified areas that were suitable for development, assisted with Masterplanning the development footprint and extent. The site inspection identified suitable habitat for a number of threatened fauna and flora species. The preliminary assessment reviewed legislative requirements, and listed documentation and assessments which would be required to support a Development Application (DA)
As supporting documentation for the DA submission, the S5 Environmental field team spent five days in the field undertaking extensive surveying of flora and fauna. S5 Environmental undertook a Detailed Ecological Assessment, as well as a tree survey of the proposed development area, which went on to inform a Vegetation Retention Plan. The team undertook targeted fauna surveys, which included techniques such as spotlighting, baited camera traps and diurnal surveys, for the following species:
Over the five days of surveying, the team recorded 50 native fauna species within the site. Vegetation outside the development area was ground-truthed as riparian shrubland on anastomosing stream channels with emergent canopy species, with the balance of the site assessed as non-remnant, with patches of regrowth vegetation.
The areas of ground-truthed vegetation for retention were used for Bushfire Attack Level (BAL) modelling. A BAL assessment was undertaken for the development to ensure future dwellings will be sited with level of risk deemed acceptable by the assessment management, SDRC. With the BAL modelling undertaken, the final number and location of lots were able to be determined, with practical vegetation management requirements discussed.
Upon completion of the field investigations, numerous meetings were held with the client throughout the process of finalising our deliverables to ensure that our findings and potential limitations were communicated and discussed, to guarantee a smooth DA process for the client. S5 Environmental undertook a State Code 16 response for the clearing of native vegetation protected under the Vegetation Management Act 1999 (VM Act) which will go on to support a referral to the State Assessment and Referral Agency (SARA).