Eco-cabin Development Application supporting documentation.

SERVICES

  • Preliminary Assessment and Advice
  • Detailed Ecological Assessment
  • Tree Survey
  • Vegetation Retention Plan
  • Bushfire Attack Level Assessment
  • Concept Rehabilitation Management Plan

Eco-Tourism Development

Mapleton

S5 Environmental was engaged by a client investigating a potential Development Application (DA) for eco-cabins to be sited on their 40.24 ha property located near Mapleton in the Sunshine Coast hinterland. Our team undertook a Preliminary Assessment and Advice report and site inspection, which highlighted constraints regarding bushfire hazards and State and Locally mapped vegetation, which assisted with the location of the cabins.

As supporting documentation for the DA submission, S5 Environmental undertook a Detailed Ecological Assessment, which included a tree survey of the proposed development areas which went on to inform a Vegetation Retention Plan. The site was host to incredible flora, with three critically endangered scrub turpentine (Rhodamnia rubescens) trees located on site during the inspection. Other observations noted by our ecologist included giant stinging tree (Dendrocnide excelsa) and ground-truthed notophyll vine Regional Ecosystems (RE). Vegetation adjacent the development areas was ground-truthed to determine the RE and fuel load, which was used for Bushfire Attack Level (BAL) modelling. A BAL assessment was undertaken for each proposed eco-cabin, to ensure all could be sited with level of risk deemed acceptable by the assessment management, Sunshine Coast Council (SCC). With the BAL modelling undertaken, the final number and location of the eco-cabins were able to be determined, with practical vegetation management solutions recommended, including Asset Protection Zones (APZ) for each cabin.

Further work undertaken by S5 Environmental included a Conceptual Rehabilitation Plan, which detailed rehabilitation to mitigate impacts to key ecological areas. Rehabilitation works included ‘edge effects’ weed control along the interface of regrowth vegetation and infill planting (the location of the scrub turpentines). SCC had requested additional planting along all mapped waterways within the site. Given the historical modification of the land, S5 Environmental negotiated the extent to be planted with Council to ensure the rehabilitation aligned with on-ground conditions, and ensure the Client was not subject to unreasonable works.

The eco-cabin proposal was approved by SCC in mid-2023.