Our Projects

PROJECT OVERVIEW

Project Overview:

Reconfiguration of a Lot Development Application for a residential subdivision.

SERVICES

  • Vegetation Management Plan
  • Detailed Rehabilitation Management Plan
  • Operational Works Certifications and Inspections

Residential Rehabilitation Works

Mansfield

S5 Environmental were engaged by a client to manage the ecological deliverables for a Reconfiguration of a Lot development application in Mansfield. Specifically;

  • A Vegetation Management Plan was developed accurately showing the location of all vegetation on-site overlayed with proposed development plans.
  • A Detailed Rehabilitation Management Plan was then developed which detailed rehabilitation to mitigate impacts caused by removal of native vegetation and increase habitat connectivity.

This site was bisected by a waterway line and our team worked closely with the Brisbane City Council as well as revegetation contractors to ensure this waterway line was rehabilitated from an extremely degraded state to a valuable ecological corridor. Invasive weed and canopy species were removed and replaced with locally occurring native ground, shrub and canopy level strata. The banks of the waterway were stabilised with jute matting and coir logs during this process to allow the vegetation time to appropriately establish.

S5 Environmental managed liaison with Brisbane City Council on behalf of our client, facilitating the ecology pre-start meeting prior to operational works as well as on and off maintenance rehabilitation inspections.

The rehabilitated waterway is currently ‘on-maintenance’ for a period of 24 months. After this time, it will be dedicated to council who will maintain this rehabilitated waterway corridor in perpetuity.